
Scroll down
Project Overview
Outcomes
14 pp
Checkout completion, 41% → 55%
18 %
Higher average order value
Challenge
Building a mixed box means fifteen decisions before checkout. The flow had to carry that without losing people between catalogue and payment.
Process
I worked with the owner directly. Requirements sessions set scope, wireframes settled structure, and the configurator took the most passes — it had to feel like filling a basket, not a form.
Deliverables
Hi-fi designs at two breakpoints, plus UX/UI support after launch.
What I've Learned
Working straight with the owner changed the pace. No PM layer, so feedback came the same day and approval took one conversation, not a chain of them.
